Saturday, 31 May 2014

Anchor - ready to use

The new anchor has worked well. The storage was the concern, but that seems to have been solved using an old bag with a hole in the bottom so the line can pass through and onto the cleat. There is only 5 metres of 6mm chain and 30 metres of rope, but we carry another 40 metres of rope if it was really needed.


No comments:

Post a Comment